Full 2
A COMMUNITY FOR
Everyone
Full 2
Full 2
A COMMUNITY FOR
Everyone
Full 2
Full 2
A COMMUNITY FOR
Everyone
Full 2
previous arrow
next arrow

Inverell Aquatic Centre Masterplan

Have Your Say

The Inverell Aquatic Centre Feasibility Options Paper has been prepared to identify how we can improve the facilities at the centre to meet community needs and aspirations over the next 40 to 50 years.

A new 50 metre outdoor pool, a warm water pool for swimming lessons and rehabilitation (with moveable floor), a revamped kiosk, gym, and extra toilets and change rooms and an indoor water play area, are among the changes proposed.

Residents are asked to view the four facility options provided below and provide feedback on which is their preferred option via a online short survey (link below).

Copies of the plans are also on display at the Council Administration Centre, the Public Library and the Inverell Pool.

Community Consultation Sessions

Two community information sessions will be held in June, with residents invited to view the plans, meet the consultants involved and also provide feedback. Sessions will be held at Inverell Town Hall Annex as follows:

  • > Wednesday 16 June, 7.00pm – 8.00pm
  • > Thursday 17 June, 9.30am – 10.30am

Please enter via the Evans Street entrance. COVID Safe check in will be required.

Facility Development Concept Options

Graphite Architects, in association with JWC Engineers, have developed the four facility development concept options which are detailed within the Inverell Aquatic Centre Facility Options Feasibility Study and are also summarized below.

OPTION ONE: Providing a multi-use 6 lane lap and program pool (with moveable floor) and outdoor water play/splash pad and toddlers pool with new amenities, plant, multi-purpose room and new front of house areas. Click image to enlarge.

IAC-OPTION-1-04062021

OPTION ONE-A: Providing a multi-use 6 lane lap and program pool (with moveable floor) and indoor water play/splash pad and toddlers pool with new amenities, plant, multi-purpose room and new front of house areas. Click image to enlarge.

IAC-OPTION-1A-04062021

OPTION TWO: Providing a 25m x 6 lane lap pool with 15m x 10m warm water/learn to swim pool and indoor water play/splash pad and toddlers pool with new amenities, plant, multi-purpose room and new front of house areas. Click image to enlarge.

IAC-OPTION-2-04062021

OPTION THREE: Providing a new 8 lane 50m outdoor pool (with moveable or pop-up boom), to replace the 55-yard pool.  This pool would be designed to have a more energy efficient and light weight structure over 25 meters of the pool to enable it to be enclosed during part autumn, all winter and part spring swimming seasons.

Added to this large and contemporary competition pool is a new indoor warm water/Learn to Swim program pool (with moveable floor 20m x 10m) and indoor water play/splash pad and toddlers pool with new amenities, plant, multi-purpose room and new front of house areas. Click image to enlarge.

IAC-OPTION-3-04062021

SITE & BUILDING LAYOUT CONCEPT IMAGES

The following images are site and building layout concepts based off option 3. Click images to enlarge.

VOTING

Residents are asked to view the four facility options provided in the Feasibility Study and provide feedback on which is their preferred option via the short online survey via the link below.

Copies of the plans are also on display at the Council Administration Centre, the Public Library and the Inverell Pool.

Voting closes 30 June, 2021 at 4.30pm.

For further information on the Inverell Aquatic Centre Masterplan please contact Council on (02) 6728 8288.

Last modified: 04-Jun-2021

OTHER COUNCIL AFFILIATED WEBSITES

CONTACT COUNCIL

Opening Hours:
Monday - Friday
8:30am - 4:30pm

Correspondence:
General Manager
PO Box 138 Inverell NSW 2360

Administration Centre

144 Otho Street
Inverell NSW 2360

Phone: (02) 6728 8288
Fax: (02) 6728 8277
Email: council@inverell.nsw.gov.au
ABN: 72 695 204 530