Inverell Aquatic Centre Redevelopment

Council Update – 22 April 2022

Over the last decade Council has commissioned several condition assessments which have indicated the Inverell Memorial Pool is reaching the end of its asset life.

Council commenced planning in earnest for a redeveloped Aquatic Centre in mid 2020. The first stage of planning was the completion of a Feasibility Study. The Feasibility Study incorporated extensive community consultation including surveys, meetings and direct stakeholder engagement. A draft Feasibility Study was placed on public exhibition during the month of June 2021. The final Feasibility Study was subsequently endorsed by Council at their meeting on the 28 July 2021. The Feasibility Study identified the key components that would be incorporated in a redeveloped centre.

Throughout the second half of 2021 and early 2022, Council in conjunction with industry experts Otium Planning, further investigated and developed the outcomes of the Feasibility Study when completing a Functional and Technical Design Brief. The Functional ad Technical Design Brief looked in more detail at component layout, costings, site constraints, construction methodology etc. The Functional and Technical design Brief will be a key informing document when Council proceeds to the next stage of the project development been the detailed design.

Council at their meeting on the 23 March 2022 resolved to endorse a Design and Construct project procurement model for the redevelopment of the Inverell Aquatic Centre and to commence the process. It is anticipated that Council will be calling for expressions of interest for the Design and Construct stage before the end of June 2022. Formal consultation with the community will occur again throughout the detailed design process.

Council’s Funding Strategy for the redevelopment of the Inverell Aquatic Centre relies upon Council project specific reserve funds, loan borrowings and grant funding. As grant funding is integral to the project proceeding, Council has recently made two grant funding applications as detailed below:

  • > $10M application under round 6 of the Federal Governments Building Better Regions Fund.
  • > $5M application under round 1 of the State Governments Multi-Sport Community Facility Fund.

Advocacy documents detailing project planning to date including concept layouts were developed to accompany each application. A copy of the Advocacy documents can be downloaded via the links below:

Download: Inverell Aquatic Centre Federal Government Funding Support Document [PDF – 4 Mb]

Download: Inverell Aquatic Centre NSW State Government Funding Support Document [PDF – 4 Mb]

Any interested persons wishing to provide comment or seek additional information are encouraged to email Council at council@inverell.nsw.gov.au.  Alternatively Council’s Civil and Environmental Services Division can be contacted on 6728 8202

 

Last modified: 22-April-2022

OTHER COUNCIL AFFILIATED WEBSITES

CONTACT COUNCIL

Opening Hours:
Monday - Friday
8:30am - 4:30pm

Correspondence:
General Manager
PO Box 138 Inverell NSW 2360

Administration Centre

144 Otho Street
Inverell NSW 2360

Phone: (02) 6728 8288
Fax: (02) 6728 8277
Email: council@inverell.nsw.gov.au
ABN: 72 695 204 530